Drum-Buffer-Rope is a production scheduling methodology derived from the Theory of Constraints, designed to maximize throughput by synchronizing production around the system's bottleneck. It ensures that the bottleneck (drum) sets the pace of production, with a buffer to protect it from disruptions and a rope to control the release of materials into the system.